Cycleway (C51)
Share Cycleway (C51) on Facebook
Share Cycleway (C51) on Twitter
Share Cycleway (C51) on Linkedin
Email Cycleway (C51) link
The Cycleway 51 section runs between Colindale Avenue and the Barnfield River Approach by Burnt Oak station.
This section is equally divided between on-road and off-road sections and recently completed in 2024. Only Sections of this route on the Barnet Loop are compliant with current design standards (LTN 1/20) such as the parallel crossing between Montrose Park and Silkstream Park.
The on-road sections of Cycleway 51 have low traffic volumes and speeds whilst the off-road sections are shared use paths that are compliant with current standards with regards to surface quality, width, and comfort.
Page last updated: 14 Feb 2025, 10:46 AM